PURCHASE PRICE
COST TO DEVELOP FOR SALE
TIME TO DEVELOP
INITIAL MEETING WITH DEPT PLANNING
ARCHITECTURAL DRAWING
PRELIMINARY PLAT APPROVAL
LOT LINE ADJUSTMENT
ENGINEERING APPROVAL
SELL PRICE
ZONING
COMPREHENSIVE PLAN
PRELIMINARY TITLE
EASEMENTS
SETBACKS
HEIGHTS
ROOF SLOPE
COVENANTS CCTC
CITY ORDINANCE
COUNTY ORDINANCE
MAXIMUM LOT COVERAGE
BUILDING FOOT PRINT
IMPERMEABLE SURFACES
GEO
SURVEY
EXEMPTION
VARIANCE
ACCESS
ELECTRIC LOCATION
GAS AVAILABLE
CAPACITY
ON SEWER
STUB OFF MAIN LINE
LARGE ENOUGH TO ACCOMMODATE
WATER SUPPLY
SERVICE LOAD
WHAT IS VOLUME
HAS LINE BEEN TAPPED
IS THERE A METER
WHO PAYS
NEED TO TEAR UP STREET
POST MAINTENANCE BOND
SET BACK
PERMEABILITY
WELL DISTANCE
LAND PERK
SAND FILTER SYSTEM ALLOWED
IS THERE A STORM SEWER SYSTEM
WHAT IS DEPTH
CAN YOU FEED INTO IT WITH A GRAVITY FLOW SYSTEM
RETENTION REQUIREMENTS
WHAT ARE FRENCH DRAIN REQUIREMENTS
NUMBER OF BUILDABLE LOTS